ODL 17069000R Guida di Installazione Pagina 19

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 63
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 18
19
(2) 2-1/2” Pan Head Sheet
Metal Screws (Not Included)
3/32” Bit
Drill
Phillips Drill Bit
TOOLS & PARTS
On roof, locate and install Top Adjustable Tube
into roof ashing. Install Trim Ring at ceiling. Install
Bottom Adjustable Tube in attic as seen in diagram.
1
Frame 2 x 4 support between joists. Span from roof
to ceiling with a length of 2 x 4 flat to outside of each
Adjustable Tube creating a “spine”.
2
Put a (2) 2-1/2” pan-head, sheet metal screw (not
included) in each connecting extension.
3
Slide next tube section in and attach with screw/s.
Continue until all but one extension is connected. Cut
and install last section of extension tube.
4
Tape ALL joints. Go to Section 9 to continue standard install.
5
Long Shaft Installation
For long shaft installation, use steps listed below, referring to
those listed on previous pages for more specific install details.
Extension Tube(s)
Top Adjustable
Tube
Bottom
Adjustable Tube
2 x 4 Support
(2) 2-1/2”
Sheet Metal
Screws
Section-11
Long Shaft Installation
Vedere la pagina 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 62 63

Commenti su questo manuale

Nessun commento